MyProjectCalcs

Concrete Wall Calculator

By Vinod Kondeti · Updated

A poured wall is a slab stood on its edge: length × height × thickness. Walls are usually poured into tall forms, so a short delivery matters more here than on a slab. You can't top up a half-full form an hour later without leaving a seam. The calculator starts with a 24 ft wall, 3 ft high and 8 in thick.

Cubic yards –

Weight in pounds (no waste added)–
Weight in US tons–
Weight in kilograms–
Cubic feet–
Cubic meters–
80 lb bags (0.60 ft³ each)–
60 lb bags (0.45 ft³ each)–
40 lb bags (0.30 ft³ each)–
80 lb bags per piece, if you mix each one on its own–
Cost in 80 lb bags–
Cost as ready-mix–

Working: –

Cost estimate (optional: enter your local prices)
lengthheightthickness

Worked example: a 24 ft garden wall, 3 ft high

Thickness Before waste With 10% 80 lb bags
6 in 36 ft³ 1.47 yd³ 66
8 in 48 ft³ 1.96 yd³ 88

At 8 in: 24 × 3 × (8 ÷ 12) = 48 ft³. With waste that's 52.8 ft³ = 1.96 yd³.

Wall thickness and reinforcement are structural decisions. A retaining wall holding back soil is a different job from a freestanding garden wall, and may need a design and permit. Use the numbers from your plans.

Openings and pockets

Subtract any window, pipe or door openings formed into the wall:

Opening volume = width × height × wall thickness

A 3 × 2 ft opening in the 8 in wall removes 3 × 2 × 0.667 = 4 ft³. Calculate it separately and subtract it from the wall total before ordering, or simply keep it as extra margin on a small wall.

Walls on footings

Most walls sit on a footing. Estimate the footing separately and add them if they're poured together. If the footing is poured first and the wall later, order for each pour separately.

Stepped and sloping walls

On a slope, the wall height changes. Split the wall into sections of constant height, run each one, and add them. For a wall whose top slopes evenly, using the average height is close enough.

Worked example: a stepped garden wall

A wall 8 in thick steps down a slope: 16 ft at 4 ft high, then 12 ft at 2 ft high. With 10% waste:

  • High section: 16 × 4 × (8 ÷ 12) = 42.67 ft³, or 46.93 ft³ with waste (1.74 yd³).
  • Low section: 12 × 2 × (8 ÷ 12) = 16 ft³, or 17.6 ft³ with waste (0.65 yd³).
  • Total: 64.53 ft³ = 2.39 yd³, or 108 × 80 lb bags.

Don't average the two heights. (4 + 2) ÷ 2 = 3 ft over 28 ft gives 61.6 ft³ = 2.28 yd³, which is about 5 bags short, because the tall section is the longer one. If you want a single entry, use the length-weighted height: (16 × 4 + 12 × 2) ÷ 28 = 3.14 ft gives the same 2.39 yd³. At almost 2.4 yd³, this wall is a ready-mix order, not a bag job.

Wall-pour mistakes

  • Measuring outside the forms. Measure the gap between the form faces, which is the actual wall thickness.
  • Thickness in feet. The thickness field takes inches. Entering 0.67 instead of 8 makes the wall about 12 times too thin.
  • Pouring in lifts without a plan. Placing concrete in layers is normal in tall forms, but each layer must go in while the one below is still workable. Ask your supplier how fast the trucks can arrive.

Concrete per 10 ft of wall

No waste is included. Multiply by your length in tens of feet.

Height Thickness Per 10 ft Cubic yards 80 lb bags
2 ft 6 in 10.00 ft³ 0.37 17
2 ft 8 in 13.33 ft³ 0.49 23
3 ft 6 in 15.00 ft³ 0.56 25
3 ft 8 in 20.00 ft³ 0.74 34
4 ft 6 in 20.00 ft³ 0.74 34
4 ft 8 in 26.67 ft³ 0.99 45
6 ft 6 in 30.00 ft³ 1.11 50
6 ft 8 in 40.00 ft³ 1.48 67

A 4 ft high, 8 in wall uses almost exactly a yard per 10 ft of length.

Poured wall or block wall?

If you're comparing a poured wall with a concrete block wall, the block calculator counts blocks and mortar bags for the same length and height. The two give very different shopping lists for the same wall.

Wall, footing, column or slab calculator?

  • Wall (this page): taller than it is thick, poured between two form faces.
  • Footing calculator: wider than it is deep, under a wall or post. Estimate it separately.
  • Column calculator: round or square piers that stand alone.
  • Bags calculator: turns the wall total into bag counts for any bag size.

Tall wall forms hold a lot of sideways pressure from wet concrete. OSHA's construction standard requires formwork to be designed, built, braced and maintained so it can support all the vertical and lateral loads that may reasonably be expected, so brace the forms before the truck arrives.

Measuring a wall

  1. Measure the length along the center of the forms, not the outside corner. On an L-shaped wall, measuring both outside faces counts the corner twice.
  2. Measure the height inside the forms from the footing or base to the planned top.
  3. Measure the thickness between the form faces at the top and bottom. Forms can bow outward under the weight of wet concrete if they aren't braced.
  4. Round the length up, not down, when the wall ends at an irregular edge.

Corners

For an L-shaped wall, add the two legs measured along the center line. If you measure both legs along the outside face, you count a block the size of the thickness × thickness × height twice. On an 8 in wall 4 ft high, that's 1.78 ft³ extra. It's small, so you can also keep it as margin.

Frequently asked questions

How much concrete for a 4 ft high, 20 ft long wall at 8 in?

20 × 4 × 0.667 = 53.33 ft³ = 1.98 yd³ before waste, or 2.17 yd³ with 10%.

Can I build a concrete wall with bags?

For a short, low wall, yes. Two yards is 90 × 80 lb bags before waste, so most walls are poured from a truck.

How much concrete per foot of wall?

At 4 ft high and 8 in thick, 2.67 ft³ per foot of length, about 0.1 yd³.

Sources

Bag yields: 0.30 / 0.45 / 0.60 ft³ for 40 / 60 / 80 lb standard concrete mix (manufacturer data sheets). The concrete guide has the formulas and worked examples. Questions about mixing water, curing time or bag yields? See the concrete FAQ.

Other concrete calculators

Related calculators