Concrete step formula: width × run × rise × n(n+1) ÷ 2
Picture each tread as a block that reaches all the way down to the ground. For n steps:
Volume = width × run × rise × n(n + 1) ÷ 2
The n(n + 1) ÷ 2 part counts how many rise-heights are stacked up: 1 + 2 + 3 + 4 = 10 for four steps.
Worked example: four steps, 4 ft wide, 7 in rise, 11 in run
- 4 × (11 ÷ 12) × (7 ÷ 12) × 10 = 21.39 ft³.
- With 10% waste: 23.53 ft³ = 0.87 yd³, or 40 × 80 lb bags.
Compare three steps of the same size: 12.83 ft³ before waste, 24 × 80 lb bags with waste. The fourth step alone adds 8.56 ft³, four times the bottom step's 2.14 ft³, because it stands four rises tall.
Landings
A landing at the top is a block as deep as the landing and as tall as the full stair height. Calculate it as a slab:
- 4 ft wide × 4 ft deep landing on a four-step stair (4 × 7 = 28 in tall): 4 × 4 × (28 ÷ 12) = 37.33 ft³ before waste.
- Then subtract the top step from the stair calculation. Run the stair calculator with one step fewer, because the landing replaces the top tread.
Reducing the volume
Solid steps against a house or slab use a lot of concrete. One way to cut the volume is to fill the core with compacted fill and pour only the outer shell. Your plans should say whether that is allowed. This calculator assumes solid concrete, so if you use fill, your actual volume will be smaller. Calculate the shell faces separately as walls and slabs instead.
Where stair estimates go wrong
- Swapping rise and run. Rise is the height of one step. Run is the depth of one tread.
- Measuring rise from the wrong point. Measure from the top of one tread to the top of the next.
- Forgetting the nosing overhang. It adds little volume, but enter the full tread depth, not the depth minus the nosing.
- Code rules. Maximum rise, minimum run and handrail rules are set by your local building code, not by this calculator.
Concrete for 1 to 6 steps (yards and bags)
For 4 ft wide steps with a 7 in rise and 11 in run, solid concrete:
| Steps | Volume before waste | Cubic yards with 10% | 80 lb bags with 10% | 60 lb bags with 10% |
|---|---|---|---|---|
| 1 | 2.14 ft³ | 0.09 | 4 | 6 |
| 2 | 6.42 ft³ | 0.26 | 12 | 16 |
| 3 | 12.83 ft³ | 0.52 | 24 | 32 |
| 4 | 21.39 ft³ | 0.87 | 40 | 53 |
| 5 | 32.08 ft³ | 1.31 | 59 | 79 |
| 6 | 44.92 ft³ | 1.83 | 83 | 110 |
Six steps need about seven times the concrete of two. That's the n(n + 1) ÷ 2 effect.
Narrower steps
At 3 ft wide with a 7.5 in rise and 10 in run, three steps are 10.31 ft³ before waste (18 × 80 lb bags with 10%). Four steps are 17.19 ft³ (29 bags).
Measuring for steps
- Measure the total rise from the ground or lower slab to the top surface, such as the door threshold or upper patio.
- Divide by the number of steps to get the rise per step. Your local code sets the limits, so check them before choosing the count.
- Measure the tread depth you plan for each step.
- Measure the width between the side forms.
If the bottom step lands on a walk or patio, add that part with the sidewalk calculator.
Forming and pouring
Steps are poured into a box of side forms with riser boards across the front. Fill from the bottom step up and keep each pour going, as QUIKRETE's data sheet advises against partial fills that leave cold joints. At 40 bags for four steps, a mixer and a helper make a big difference.
Frequently asked questions
How many bags of concrete for 3 steps?
For 4 ft wide steps with a 7 in rise and 11 in run, 12.83 ft³: 22 × 80 lb bags with no allowance, or 24 with 10% waste.
Why does the result jump when I add one step?
Each new step is a full stair-height block. The nth step adds n rises of height.
How many bags of concrete for 4 steps?
For 4 ft wide steps with a 7 in rise and 11 in run, 21.39 ft³: 36 × 80 lb bags with no allowance, or 40 with 10% waste.
Sources
- QUIKRETE Concrete Mix (No. 1101) data sheet: bag yields. https://www.quikrete.com/pdfs/data_sheet-concrete%20mix%201101.pdf
- SAKRETE High-Strength Concrete Mix technical data sheet: bag yields. https://www.sakrete.com/wp-content/uploads/2024/01/Sakrete-High-Strength-Concrete-Mix-TDS.pdf