Solid poured steps are a stack of blocks. The bottom step is one rise tall, the next is two rises, and so on. Total volume = width × run × rise × n(n+1)/2. The calculator applies this for any number of steps.

runriseheight
Cost estimate (optional, enter your local prices)
Cubic yards–
Cubic feet–
Cubic meters–
80 lb bags (0.60 ft³ each)–
60 lb bags (0.45 ft³ each)–
40 lb bags (0.30 ft³ each)–
Cost in 80 lb bags–
Cost as ready-mix–

Working: –

How do I measure for a stairs pour?

Stairs concrete questions

How much concrete for 3 steps, 4 ft wide, 7 in rise, 11 in run?

4 × (11÷12) × (7÷12) × 6 = 12.8 ft³ = 0.48 yd³, about 22 bags of 80 lb mix.

Why does each extra step add more than the last?

Each new step sits on top of the ones below, so the bottom tread runs the full height. Adding a fourth step to the example adds about 67% more concrete.

Bag yields: 0.30 / 0.45 / 0.60 ft³ for 40 / 60 / 80 lb standard concrete mix (manufacturer data sheets). The concrete guide has the formulas and worked examples.