Short version: dig the hole about three times as wide as the post and about one-third of the post’s above-ground height deep, plus room for gravel. Add 4 to 6 in of gravel, brace the post plumb and fill around it with concrete. Fast-setting mix can be poured in dry and watered. Wait about 4 hours before loading the post (QUIKRETE), longer with regular mix. These are QUIKRETE’s and Sakrete’s rules of thumb; local code, frost depth and soil can call for more.
To count bags for a whole fence line, use the post hole concrete calculator. It subtracts the post from each hole.
1. Size the hole
| Measure | Rule of thumb | Example: 6 ft fence, 4×4 post |
|---|---|---|
| Width | About 3 × the post width (QUIKRETE, Sakrete) | 3 × 4 in ≈ 12 in hole |
| Depth for the post | About 1/3 of the above-ground height (Sakrete). QUIKRETE’s guide says 1/3 to 1/2 | 6 ft ÷ 3 = 24 in in the ground |
| Extra for gravel | About 6 in (QUIKRETE) | 24 + 6 = 30 in hole |
| Post length | Height + depth | 6 ft + 2 ft = 8 ft post (Sakrete’s example) |
The wording varies: QUIKRETE’s data sheet says 1/3 of the overall post length, while Sakrete’s examples are a 2 ft hole for a 6 ft fence and 36 in for an 8 ft fence. Lean deeper for gate posts, windy sites and soft soil.
University of Georgia Extension says wooden line posts should go at least 2 ft deep, preferably deeper, and deeper still in sand or wet soil.
Frost. Sakrete’s first step is to check your local code, because the required depth depends on the frost line in your area. QUIKRETE’s project sheet says that when a post is structural, such as for a deck, the hole must go at least 6 in below the frost line. Ask your building department what applies to a fence.
Shape. Sakrete says straight sides are fine and wider at the bottom is better, but a hole narrower at the bottom is not. Hand-dug holes tend to taper, so square up the bottom. For loose or sandy soil, QUIKRETE recommends a tube form, or a wider, dish-shaped hole.
2. Add gravel and set the post
- Tamp the bottom, then add gravel. QUIKRETE says to tamp the sides and bottom of the hole until firm and add 6 in of gravel or crushed stone for drainage. Sakrete says 4 to 6 in. Compact it with the end of the post or a 2×4.
- Stand the post and plumb it on two adjacent faces. QUIKRETE braces each post with two angled 2×4s on adjacent sides, screwed to the post and fastened to stakes. Then check the level on both faces again.
- Use a post meant for the ground: pressure-treated wood or galvanized steel, with metal posts coated against rust (QUIKRETE). UGA Extension warns that some store 4×4s aren’t treated for ground contact, so check the tag.
3. Fill with concrete: dry-pour or mixed
Fast-setting mix, poured dry. This is the no-mix method both makers describe for their fast-setting products. They do it in a different order:
- QUIKRETE Fast-Setting Concrete Mix (No. 1004): pour the dry mix to 3 to 4 in below the top of the hole. Then add about 1 gallon of water per 50 lb bag, depending on soil, until the powder is saturated. If the hole is deeper than 30 in, fill it in lifts of 30 in or less and let the water soak through each one.
- Sakrete Fast Setting Concrete: fill the hole about one-third full of water first, then pour the dry mix in evenly around the post, adding water if the top is still dry. Sakrete calls water-first “crucial” for even hydration.
Follow the directions for the brand you bought.
Regular concrete mix. Mix it as the bag says, shovel it in, rod out air pockets with a scrap of wood and brace the post (Sakrete). QUIKRETE says regular Concrete Mix works too, but wait a few days before heavy loads.
4. Finish the top: soil cap or sloped concrete?
The sources disagree here, and the reason is wood rot.
- QUIKRETE stops the concrete 3 to 4 in below ground and fills the top with soil or sod, though one of its tips mentions sloping the concrete away from the post.
- Sakrete brings the concrete up to the top and slopes it down and away from the post, warning that backfilling with dirt can cause premature rot.
- The USDA Forest Service says to keep concrete anchorage at least 6 in below ground line, because a jacket that reaches the surface “traps and holds water next to the post”. Rot is worst at the groundline, and crushed rock can hold water around a post in clay.
What they agree on: don’t let water sit against wood. Whichever top you use, shape it to shed water away from the post.
5. How long before you can hang the fence?
| Product | Initial set | Before loading the post |
|---|---|---|
| QUIKRETE Fast-Setting (No. 1004) | 20 to 40 min | 4 hours (data sheet). Its project sheet says to allow longer below 72 °F |
| Sakrete Fast Setting, dry-pour | Hold the post 3 to 5 min | 30 minutes before any load |
| Sakrete, any mixed concrete | — | 24 hours |
| QUIKRETE regular Concrete Mix | — | A few days before heavy loads |
QUIKRETE’s data sheet lists the fast-setting mix at 1,000 psi at 24 hours, 2,500 psi at 7 days and 4,000 psi at 28 days. It also says to protect the concrete from freezing for at least 48 hours.
How many bags per post?
Here is the example hole above: a 12 in hole, 30 in deep, with 6 in of gravel and the concrete stopped 3 in below grade. That leaves 21 in of concrete around a 4×4 (3.5 in actual):
- Volume = [π × (12 ÷ 24)² − (3.5 ÷ 12)²] × (21 ÷ 12) = 1.23 ft³ per hole.
- QUIKRETE Fast-Setting yields 0.375 ft³ per 50 lb bag and 0.45 ft³ per 60 lb bag. That’s 1.23 ÷ 0.375 = 3.3, so 4 × 50 lb bags, or 1.23 ÷ 0.45 = 2.7, so 3 × 60 lb bags, per hole.
- For ten posts with 10% waste: 13.5 ft³, so 36 × 50 lb or 30 × 60 lb bags.
The makers’ quick figures (QUIKRETE: two 50 lb bags for a 3 in post in a 9 in × 30 in hole; Sakrete: “about two bags” per 6 ft fence post) assume smaller holes than the 3× rule gives, so calculate from your real hole. The post hole calculator gives 40, 60 and 80 lb counts. For 50 lb fast-setting bags, divide the cubic feet it shows by 0.375. Setting deck posts in tube forms? Use the sonotube calculator. For a round concrete pier that rises above the ground, such as a gate pillar, use the column calculator for round piers.
Frequently asked questions
How deep should a fence post hole be?
About one-third of the above-ground height (Sakrete), plus about 6 in for gravel (QUIKRETE): a 30 in hole for a 6 ft fence. Structural posts must go at least 6 in below the frost line (QUIKRETE).
How wide should the hole be?
About three times the post width, so roughly 12 in for a 4×4.
Do I mix the concrete or pour it in dry?
Fast-setting mix can go in dry. QUIKRETE adds water after the mix, Sakrete puts water in first. Mix regular concrete before it goes in.
How long until I can attach rails?
About 4 hours with QUIKRETE Fast-Setting (longer below 72 °F), 30 minutes with Sakrete’s dry-poured fast-setting mix, 24 hours with Sakrete-mixed concrete, and a few days with QUIKRETE regular mix.
Should concrete come up to ground level?
The sources differ: QUIKRETE caps with soil, Sakrete slopes concrete away from the post, and the USDA Forest Service keeps it 6 in below ground for wood posts. Either way, water must drain away from the wood.
Sources
- QUIKRETE Fast-Setting Concrete Mix No. 1004 data sheet (rev. Nov 2025): hole 3× post, depth 1/3 of post height, ~1 gal water per 50 lb, lifts ≤ 30 in, 4 h wait, yields 0.375/0.45 ft³, strengths, 48 h freeze protection. https://www.quikrete.com/pdfs/data_sheet-fast%20setting%20concrete%20mix%201004-50.pdf
- QUIKRETE “Setting Posts” project sheet: 6 in gravel, 6 in below frost line for structural posts, loose-soil holes, extra time below 72 °F. https://www.quikrete.com/pdfs/projects/settingposts.pdf
- QUIKRETE “Setting Posts in Concrete”: 1/3–1/2 above-ground length plus 6 in, bracing, tube forms. https://www.quikrete.com/athome/settingposts.asp
- QUIKRETE FAQ: regular Concrete Mix needs a few days before heavy loads. https://www.quikrete.com/contactus/faqs.asp
- Sakrete “Setting Posts & Poles”: frost line, 3× width, 1/3 depth examples, 4–6 in gravel, water-first method, slope away, 30 min / 24 h. https://www.sakrete.com/project-guide/setting-posts-poles/
- University of Georgia Extension Circular 774 “Fences for the Farm” (reviewed 2024): line posts ≥ 2 ft deep; ground-contact treatment. https://fieldreport.caes.uga.edu/publications/C774/fences-for-the-farm/
- USDA Forest Service, Forest Products Laboratory, “Protecting Wood Fences for Yard and Garden”: concrete ≥ 6 in below ground line; groundline decay. https://research.fs.usda.gov/download/treesearch/5700.pdf